There are three things that you can do about concrete cracks: you can prevent, control, or repair them. In our three-part series on effective crack prevention, control, and repair, we look at the aforementioned three topics.

So, How Do You Prevent Concrete from Cracking?

You cannot expect to prevent all cracking. But it is possible to significantly reduce the number of cracks by taking a few important measures.

Reducing the Amount of Water Used

The number one way to prevent concrete cracking is to reduce the amount of water added. Less water mixed into the concrete means there will be less water to leave the concrete when it dries. And as a result, less shrinkage will occur.

Water should be reduced to the minimum amount required to allow concrete to still get proper placement and compaction. And you can do this using chemical water reducers. These will make quite a large reduction in water while still providing workable concrete.

Choosing the Right Mix

The gradation of your aggregates has an influence on whether your concrete cracks as well because fine aggregates demand significantly more water than coarse aggregates. So be cautious of concrete mixes with too much sand or a high cement content. Either mix will demand more water.

Though, getting more cement may seem tempting as it does allow for higher strength. But it may also result in more shrinkage and additional cracks. An experienced and knowledgeable concrete supplier can deliver you a well-proportioned mix that will minimize shrinkage.

Controlling Heat of Hydration

Heat generated by the hardening concrete (i.e., heat of hydration) will cause concrete to expand slightly. This can lead to cracking when the concrete cools and contracts after it has hardened. Mass concrete and hot weather will also contribute to this troublesome condition.

But controlling the heat of hydration can help prevent these thermal shrinkage cracks by reducing the initial thermal expansion. You can also reduce heat of hydration by using low-heat-of-hydration cement or supplementary cementing materials, such as fly ash and slag. Finally, if you start the concrete at a lower initial temperature by using chilled water and aggregates, you may be better able to control the cracking.

Adding Moisture to Freshly Hardened Concrete

After the concrete has hardened, the less-water-is-better rule is reversed. Freshly hardened concrete must be protected from drying out too quickly. So the strengthening process requires moisture. But if the concrete dries out too soon, the concrete will be weak and likely crack.

The cement hydration process continues long after hardening, but the most critical time is in the first several days. Proper wet curing or other measures to prevent moisture evaporation are essential during this time.

Ready for Part 2?

Join us tomorrow as we cover how to control concrete cracks.

Related News

  • Concrete Best Practices

    Cold Weather Concreting (Came Early this Year)

    Written by: Kevin Yuers

    It is officially winter and it came early this year. For me, winter officially starts when I receive that first...

    Read More
  • Concrete Waterproofing

    Can anything really be waterproof?

    Written by: Kevin Yuers

    Traditionally, waterproofing of concrete structures has been accomplished using a membrane of some sort. The membrane can be anything from...

    Read More
  • Concrete Waterproofing

    What does waterproof mean?

    Written by: Kevin Yuers

    What does it mean to be “waterproof”? Can anything really be truly waterproof? I’m not speaking philosophically. The question is...

    Read More
  • Concrete Waterproofing
    Kryton's logo consists of a yellow diamond behind a gray webbed globe that has the name "Kryton" over top of it.

    Why waterproofing with surface membranes is obsolete thinking

    Written by: Kevin Yuers

    A local issue making headlines in Vancouver is the destruction of the gardens above Robson Square in the heart of...

    Read More