• Integral Waterproofing & Durability Solutions
  • Contact Us

Marina Bay Sands SculptureThis summer, the Vancouver Art Gallery is featuring an exhibit called Grand Hotel: Redesigning Modern Life. The exhibit charts the evolution of the MGM Grand Hotel from an isolated and utilitarian structure to a world renowned cultural phenomenon. The show takes visitors through the evolution of hotel uses and design, and notably ends with the exceptionally contemporary Marina Bay Sands in Singapore.

This $5.7 billion mega-scale project is incredibly complex, combining bridge design and building technology. As Asia Pacific’s largest integrated resort, Marina Bay Sands possesses a distinct identity which has distinguished Singapore from other cities. This project was also built on reclaimed land, and surrounded by seawater, making the below grade concrete susceptible to damaging corrosion. Kryton’s distributor in Singapore (Lee Construction Pte Ltd.), was approached by the project team, to find a sole waterproofing product that could address numerous concrete waterproofing issues.

Marina Bay Sands_concrete waterproofing_krytonChallenges included:

  • Tight construction timeline
  • Multiple contractors working      on the site
  • An easy, efficient      application, and permanent system
  • Close proximity to salt      water
  • System must be able to      withstand significant hydrostatic pressure – deepest point is 25      meters (82 feet) below grade

Lee Construction presented Kryton’s Krystol Internal Membrane (KIM) as the perfect option. By simply adding KIM to the concrete mix at the time of batching, waterproofing concrete becomes a quick and easy process that won’t hold up the construction timeline. The Krystol system uses advanced integral crystalline waterproofing technology to transform porous concrete into a permanent, water-resistant barrier and provide a guaranteed defense against water damage and steel reinforcement corrosion. If cracks later form, the incoming water will react with KIM and trigger further crystal growth, filling cracks and keeping the structure watertight.

Marina Bay Sands opened on April 27th, 2010 and has seen 19.6 million visitors walk through its doors in its first year of operations. It remains a landmark for the city of Singapore, as a symbol of contemporary culture.

Related News

  • Sustainable Construction
    Kryton's logo consists of a yellow diamond behind a gray webbed globe that has the name "Kryton" over top of it.

    FIFA World Cup Encourages Green Tourism

    Written by: Alex Emlyn

    As I was enjoying the opening weekend of the FIFA World Cup, I couldn’t help but wonder if South Africa...

    Read More
  • Sustainable Construction

    Building techniques: Quality or sustainability?

    Written by: Alex Emlyn

    These days it’s trendy to discuss environmental sustainability, LEED, and green building techniques in the construction industry. Increasingly, builders, specifiers,...

    Read More
  • Sustainable Construction
    Kryton's logo consists of a yellow diamond behind a gray webbed globe that has the name "Kryton" over top of it.

    LEED pros to have latest green building know-how

    Written by: Alex Emlyn

    Big changes to the credentialing system of Canada’s green building world are coming. A new three-tiered credentialing system will be...

    Read More
  • Concrete Industry News Sustainable Construction
    Kryton's logo consists of a yellow diamond behind a gray webbed globe that has the name "Kryton" over top of it.

    Storm Water Management in New Orleans

    Written by: Kryton Marketing

    Half of New Orleans is located below sea level. When water enters the area, the only way to remove it...

    Read More